Narra Residences

Dairy Farm Walk S
Prices Upon Request

HIGHLIGHTS

1 – 5

BEDS

BATHS

517 – 1,679

SQFT

Discover Narra Residences (翠岚轩) — a tranquil new launch condominium in District 23, designed as a forest retreat within the city.
Developed by Dairy Farm Walk JV Development Pte Ltd, this 99-year leasehold development spans a lush 21,881 sqm site along Dairy Farm Walk, surrounded by the Bukit Timah Nature Reserve and Upper Pierce Reservoir.

Inspired by the Quarry, Forest, and Reservoir, Narra Residences harmoniously blends modern architecture with its natural surroundings. The development features seven residential blocks ranging from 6 to 16 storeys, offering 540 exclusive units — from practical 1-bedroom + study apartments to luxurious 5-bedroom residences with private lifts.

With its forest-at-heart design philosophy, Narra Residences brings together organic architecture, cascading water features, and curated landscapes, creating a serene sanctuary that celebrates tropical living in balance with nature.
Public preview begins Mid-January 2026.

Unit Types:

 

1 Bedroom + Study

1 Bedroom + Study

-

517 sqft

-

2 Bedrooms Compact

-

560 sqft

-

2 Bedrooms Premium

-

646 sqft

-

2 Bedrooms with HS

-

689 - 700 sqft

-

2 Bedrooms with HS + Study

-

721 sqft

-

2 Bedrooms + Study

-

721 sqft

-

3 Bedrooms Compact

-

818 sqft

-

3 Bedrooms Flexi

-

872 sqft

-

3 Bedrooms Premium

-

990 - 1,023 sqft

-

3 Bedrooms Premium + Study

-

1,152 - 1,173 sqft

-

4 Bedrooms Compact

-

1,152 sqft

-

4 Bedrooms Compact

-

1,378 sqft

-

5 Bedrooms

-

1,658 - 1,679 sqft

-

SHARE THIS PROPERTY

Narra Residences is envisioned as a refined sanctuary within nature, integrating form and function in perfect symmetry. Each home is crafted to enhance light, ventilation, and privacy — creating a space that feels grounded, elegant, and deeply connected to the environment.

Development Overview

  • Developer: Dairy Farm Walk JV Development Pte Ltd

  • Tenure: 99 years from 1 July 2025

  • Site Area: 21,881.10 sqm

  • Total Units: 540

  • Blocks: 3 (6-storey), 2 (13-storey), 2 (16-storey)

  • Carpark Lots: 546 (including 17 EV lots and 5 accessible lots)

  • Expected Vacant Possession: 20 January 2030

  • Architect: P&T Consultants Pte Ltd

  • Landscape Consultant: Ecoplan Asia Pte Ltd

Each residence is fitted with premium quartz countertops, porcelain tile flooring, and engineered finishes, with appliances from Miele, De Dietrich, and Ernestomeda kitchens. Select 5-bedroom units include private lifts, walk-in wardrobes, and dual kitchens for elevated multi-generational living.

Smart-home integration ensures convenience, while sustainability features like EV charging lots, green landscaping, and natural ventilation systems align with modern eco-conscious living.

Situated at 50–64 Dairy Farm Walk, Narra Residences enjoys the tranquillity of the Dairy Farm Nature Corridor while maintaining quick access to key amenities in Bukit Panjang, Hillview, and Upper Bukit Timah.

Transport & Access

  • ~8-minute walk to Hillview MRT (Downtown Line)

  • Minutes to Bukit Timah Expressway (BKE) and Pan-Island Expressway (PIE)

  • Direct routes to Downtown Core, Orchard Road, and Jurong Lake District

Nature & Recreation

  • Bukit Timah Nature Reserve

  • Dairy Farm Nature Park

  • Zhenghua Park & Wallace Trail

  • Upper Pierce Reservoir & Central Catchment Park Connector

Shopping & Amenities

  • The Rail Mall, HillV2, and Bukit Panjang Plaza for groceries and dining

  • Beauty World Centre and The Grandstand a short drive away

  • Local hawker delights and cafés along Upper Bukit Timah Road

Education

  • Within proximity to top schools including CHIJ Our Lady Queen of Peace, Bukit Panjang Primary School, and German European School Singapore (GESS).

Perfect for families and nature enthusiasts, Narra Residences offers the best of both worlds — green tranquillity with modern connectivity.

Narra Residences offers a full suite of resort-inspired facilities, thoughtfully designed around the elements of Water, Stone, and Forest.

Key Facilities

  • 50m Lap Pool & Family Pool

  • Forest Lounge & Quarry Garden Pavilion

  • Kids’ Adventure Play Zone & Family Lawn

  • Clubhouse with Gourmet Kitchen & Function Rooms

  • Wellness Gym, Yoga Deck & Reflexology Path

  • Golf Simulator & Co-working Lounge

  • BBQ Terrace & Sky Pavilions

  • EV Charging Points & Smart Parcel Lockers

Every detail — from cascading landscape decks to elevated sky gardens — is designed to evoke a sense of calm retreat, where residents can unwind, connect, and recharge in harmony with nature

  1. What is Narra Residences?
    • Narra Residences is a new 99-year leasehold condominium located at Dairy Farm Walk within the Bukit Panjang Planning Area. Developed by Dairy Farm Walk JV Development Pte Ltd, it features 540 units spread across seven blocks ranging from 6 to 16 storeys, designed as a forest-inspired sanctuary
  2. Where is Narra Residences located?
    • Narra Residences is located at 50–64 Dairy Farm Walk, Singapore 679268–679277, in District 23. The development sits beside the Dairy Farm Nature Corridor, offering residents direct access to greenery, forest trails, and recreational parks
  3. When is Narra Residences previewing?
    • The public preview for Narra Residences begins Mid–January 2026, with showflat access available by appointment.
  4. Who is the developer of Narra Residences?
    • The project is developed by Dairy Farm Walk JV Development Pte Ltd, consisting of reputable partners with a strong track record in delivering high-quality residential communities in Singapore.
  5. What unit types are available at Narra Residences?
    • Narra Residences offers a wide mix of 1- to 5-bedroom units, including:

      • 1 Bedroom + Study (517 sqft)

      • 2 Bedroom Compact / Premium / +Study / with HS

      • 3 Bedroom Compact, Flexi, Premium & +Study

      • 4 Bedroom Compact & Premium

      • 5 Bedroom with Private Lift (1,658–1,679 sqft)

  6. How many carpark lots are available?
    • The development provides 546 carpark lots, including 17 EV charging lots and 5 accessible lots for added convenience
  7. What are the top facilities at Narra Residences?
    • Facilities include:

      • 50m Lap Pool & Family Pool

      • Forest Lounge, Quarry Garden Pavilion & Cascading Landscape Decks

      • Kids’ Adventure Play Area

      • Fully Equipped Gym, Yoga Deck & Wellness Garden

      • Clubhouse with Function Rooms & Gourmet Kitchen

      • Co-working Lounge, Golf Simulator & BBQ Terraces

      • Smart-home integration & smart parcel lockers

  8. How close is Narra Residences to public transport?
    • Residents are within walking distance to Hillview MRT (Downtown Line), offering direct access to Beauty World, Botanic Gardens, Bugis, and the CBD. The site also enjoys quick connectivity to BKE and PIE for islandwide travel.
  9. What makes Narra Residences unique?
    • Narra Residences stands out for its:

      • Forest-inspired architecture grounded in the Quarry–Forest–Reservoir design concept

      • Low-density, nature-integrated living environment

      • Multi-height blocks (6, 13, 16 storeys) that flow with the natural terrain

      • Large 21,881 sqm site with curated landscaping and water features

      • Premium interiors with quartz countertops, porcelain tiles, and branded appliances

      It offers a rare nature retreat within minutes of urban amenities.

  10. Is Narra Residences a good investment?
    • Yes. The project offers:

      • Strong appeal to families seeking nature-centric living

      • Proximity to Hillview MRT, Bukit Timah Nature Reserve & German European School (GESS)

      • Limited supply of large land plots in the Dairy Farm corridor

      • Strong rental potential from expatriates working in Bukit Timah, one-north & CBD

      The forest retreat concept and developer reputation contribute to long-term capital appreciation.

  11. When is the expected TOP?
    • Vacant Possession is expected on 20 January 2030, with Legal Completion on 20 January 2033
  12. How do I register for the preview or showflat?
    • Prospective buyers can register through Singapore Luxury Homes for:

      • Early preview access

      • Floor plans and e-brochure

      • Priority booking

      • First release pricing

 

ENQUIRE ABOUT

Narra Residences

Dairy Farm Walk S

FEATURED

Listings

Villas @ Greenbank Park

Starting from $9,500,000

Bedrooms: 5 - 6

Representing The Finest Properties

Contact Us

property agency